PRESSURE TESTING
Pressure Testing and Pipeline Commissioning
All our pressure testing technicians have a Bachelor’s degree ( BSc, BTech ) or Higher National Diploma (HND) in Mechanical or Industrial Engineering. They are approved and authorized by the Ghana Factories Inspectorate commission, and they also have UK City and Guilds qualifications, having been independently accredited in Aberdeen. We have a wide range of pressure testing equipment including some of the latest digital gauges allowing our engineers and technicians to ensure that your pressure vessels and pipelines are fit for purpose.
Other Pipeline Commissioning services we undertake includes :
- Pipeline Cleaning and Pigging
- Nitrogen Purging and Preservation of Pipelines and Vessels
A pressure test is used to determine the integrity of a pipeline after installation, before its commission and during its service life. This test is particularly useful in carrying out integrity assessments of pipelines carrying hazardous liquid or gas to prevent leaks or rupture under normal operating conditions. There are two kinds of pressure testing; hydrostatic testing and pneumatic pressure testing.
Pipelines are sometimes designed to withstand maximum operating pressure (MOP) such as those carrying natural gas and hazardous liquid. It must, therefore, be tested to ensure that the pipe is structurally sound and is capable of withstanding internal pressure from the product being carried. In hydrostatic testing, the section to be tested is cleared of the product being carried and replaced with water. The pipe is then tested to at least 125% of MOP for 4 to 6-hours. Pneumatic testing is done by using an inert gas such as nitrogen or air instead of water. Since compressed gas stores a greater amount of energy than compressed liquid, this test is used for pipelines that operate at pressures above 100 psig.PIPELINE CLEANING, DEWATERING AND DRYING
Water retained within the pipelines after hydro testing will cause rapid corrosion as well as alter the purity of fluid channeled through them. Consequently, all clients must invest in pipeline drying after hydro testing to ensure their pipelines function as efficiently as possible. Once a hydro test has been completed, the same pig as was used to fill the line can be run back to the launch site utilizing compressed air. Pipeline dewatering can be one of the most dangerous procedures in the pre-commissioning process. This is due to the fact that air is compressible and water is not; large air pockets develop in front of the dewatering pig creating violent releases of air/water at the terminus. I&E Technicians monitor the pig as it dewaters so that valves and piping at the release point maintain a constant backflow pressure to minimize danger to both personnel and equipment. Once pipeline cleaning and dewatering is complete the drying process can commence.PIPELINE DRYING, NITROGEN PURGING, AND PRESERVATION
The below listed are three effective methods we could adopt to achieve pipeline drying on-site based on the pipeline conditions or as per the project specification :- a. Pigging and Swabbing
- b. Pipeline Drying with Nitrogen
- c. Compressed Air Pipeline Drying